Hvac design engineer((also knowledge on plumbling)
Overall building and heating loads have been calculated. Heat load calculation at software Elite during load calculations all sensible and latent heat, sources have been considered. The air condition systems have been provided comfort in all room through the operating period. All the calculations in accordance with ASHRAE and project specification given by consultant. Air distribution systems have been designed in accordance with SMACNA, and duct/chilled water pipe design at software Elite. Air outlets and inlets have been shown on the drawing. Static pressure calculations for selection of blower. Air system equipment and duct works, supply and return grills/diffusers have been installed according to approved construction drawing and specifications and manufacturers installation manual. Estimation of air conditioning equipments and accessories. Preparation of bill of quantity (BOQ). Material requisition for erection work. Maintaining documents records for work carried out. Co ordination with electrical engineer, mechanical engineer, and interior decorator. Guiding the Auto CAD draftsman for preparing airflow schematic drawing, floor plan, section, foundation and wall opening drawing as per the consultant Civil approved drawing.
To view links or images in this forum your post count must be 1 or greater. You currently have 0 posts.
__________________
Thank You,
Administrator
TheIndiaJobs.com Forums
|